25 MW Jinar Sugar Mill due diligence with AJC

Vital Engineering carried out a detailed due diligence study for the 25 MW Jinar Sugar Mill project in collaboration with AJC. The work included technical, financial, and operational assessments to ensure the project’s feasibility and reliability. Our team provided clear insights and recommendations to support informed decision-making and smooth project execution.

DCS FAT with Hollysis China for Engro Power Project

Vital Engineering successfully completed the DCS FAT with Hollysis China for the Engro Power Project. This project involved thorough testing and verification of the Distributed Control System to ensure smooth and reliable plant operation. The teamwork between Vital Engineering and Hollysis ensured high-quality performance and compliance with Engro’s standards. This milestone reflects our commitment to delivering excellence in power and automation solutions.

Factory Acceptance test in HTC China for Steam Turbine

Vital Engineering successfully completed a Factory Acceptance Test (FAT) in HTC China for a Steam Turbine project. The test ensured that all systems and components met the required design and performance standards before delivery. Our team verified operational efficiency, safety, and reliability, confirming the turbine’s readiness for site installation and smooth operation.

NIMIR 20 MW HTC Project Sheikhupura